Posted 10 months ago
Operations Technician Storage and Loading
@ Pacific Energy Canada
Squamish, British Columbia
Overview
Pacific Energy Canada, through its subsidiary Woodfibre LNG, is hiring a full-time Operations Technician for storage and loading at its Squamish, BC project site. The role supports shift operations through start-up into the operational phase, covering plant readiness, permit-to-work compliance and HSSE. The posting states an hourly rate of CAD $50.47 to $63.86.
Pay:
$50.47–$63.86 an hour
Responsibilities:
- Monitor plant and equipment status and operating procedures on shift
- Support permit-to-work isolations and maintenance handovers
- Ensure hazards are mitigated and HSSE compliance is maintained
- Provide daily plant reports and coordinate with other departments
Requirements summary:
- High school diploma
- 2-3 years in industrial or storage and loading facilities
- 4th Class Power Engineering Certificate minimum
- Knowledge of on-site first intervention and emergency response
- Experience with permit-to-work systems
Tools & skills
Source and dates
Employer career site / ATS feed · workable
- Employer posting date
- 2025-12-30
- First seen by our source
- 2026-10-09
- Source record updated
- 2026-10-15
These dates describe the source record, not a live verification that the employer is still hiring. Check the original posting.
Job details
| Seniority | Mid level |
| Department | Manufacturing & production |
| Experience | 2+ years |
| Hours per week | 40 (estimated) |
| Travel | air: none · ground: none |
| Work setting | Plant or factory, Vehicle |
| Position | Sitting and standing |
| Physical demands | physical moderate · computer moderate |
| Languages | English |
| Licences & certifications | 4th Class Power Engineering Certificate |
| Driver’s licence | required |
| Background checks | drug and alcohol |
| Education | High school (required) |
Summary and details written by AI from the posting; the employer’s posting is the authority.
Pacific Energy Canada
Saved company profile
Historical company information from a saved The Jobs API profile (LinkedIn/Crunchbase fields). It is not live-verified; figures may have changed. Missing values remain unknown.
Woodfibre LNG is the first LNG export facility in the world to commit to achieving net zero emissions by 2027.
Full company description
The Woodfibre LNG Project is operated by Woodfibre Management Ltd, a privately held Canadian company based in Vancouver, British Columbia. The Woodfibre LNG facility is being built on the site of the former Woodfibre pulp mill site, which is located about seven kilometers southwest of Squamish, B.C. on the traditional and unceded territory of the Sḵwx̱wú7mesh Úxwumixw (Squamish Nation). Woodfibre LNG is the first LNG export facility in the world to commit to achieving net zero emissions by 2027. During construction, Woodfibre LNG expects a peak workforce of more than 800 individuals, with over 100 long-term operating positions at the facility once construction is complete. If you are interested in a career at Woodfibre LNG, please visit woodfibrelng.ca/careers
- LinkedIn followers
- 75,190
- People associated on LinkedIn
- 177
- Reported office locations
- Vancouver, BC, CA
- PO Box 2060, Squamish, British Columbia V8B 0B4, CA
- Business categories
- Oil and Gas
- Environmental Engineering
- Energy
- Hydroelectric
- Other recorded names
- Pacific Energy Canada
- Woodfibre Management Ltd
- Woodfibre LNG
- Profile identifies a recruitment agency
- No
- Reported total investment
- 0
Currency and observation date were not supplied; this is not a current valuation or a funding round.
The Woodfibre LNG Project is operated by Woodfibre Management Ltd, a privately held Canadian company based in Vancouver, British Columbia. The Woodfibre LNG facility is being built on the site of the former Woodfibre pulp mill site, which is located about seven kilometers southwest of Squamish, B.C. on the traditional and unceded territory of the Sḵwx̱wú7mesh Úxwumixw (Squamish Nation). Woodfibre LNG is the first…
| Field | Value |
|---|---|
| Industry | Oil and Gas |
| Company size | 51-200 employees |
| Headquarters | Vancouver, BC |
| Organization type | Privately Held |
| Year founded | 2013 |
| Open jobs on Jobsy | 32 |
| View page |
Project
The Woodfibre LNG Project is located approximately 7 km west-southwest of Squamish, British Columbia. It involves the construction and operation of a liquefied natural gas (LNG) export facility on the previous Woodfibre pulp mill site, which would have a storage capacity of 250,000 m3 and would produce approximately 2.1 million tons per year of LNG.
Woodfibre Management Ltd. is a privately held Canadian company based in Vancouver and a subsidiary of Pacific Energy Corporation Limited.
Position
The Operations Technician S&L is an integral part of Woodfibre LNG’s dynamic Operations team. The successful candidate reports directly to the Shift Supervisor. This role will be based on the Project Site, in Squamish, BC., and you will play an essential part in supporting the company’s operations team through the Operations Readiness Assurance Phase into Start-Up on into the Operational Phase of the project. During Operational Phase as Operations Technician Process on shift you will also be a key contributor that the environmental practices and social responsibilities to the community, which are held to the uppermost standards as set out by Woodfibre LNG.
Key Responsibilities:
The successful applicant will:
- Responsibility/ownership for safe production and execution of activities/tasks in their area during their duty.
- Maintains a thorough knowledge of current operational status of the plant and equipment in the process section by reference to daily instructions, logbooks and shift change over communications.
- Maintains a thorough understanding of current safety procedures, and operating procedures / work instructions as well as Standing Orders to ensure adherence by all personnel in the process area.
- Support the Operations Management in executing the ORA Plan to ensure readiness for Start-Up into the Operational Phase of the project and throughout the life cycle of the facility.
- Ensure availability and Reliability of plant and equipment during their shift
- Support Implementation of the agreed Maintenance Strategy
- Support PTW including functionality/improvements, isolations standards, competencies, issuing, precautions, compliance, auditing, PTW manuals, authorization.
- Ensure the operational area is free of hazards and risks are mitigated to ALARP expectations
- Ensure all equipment and plant, to be handed over for maintenance is correctly isolated and in safe state for personnel to undertake tasks
- Support the development and implementation of check lists & routines for the plant and equipment
- Timely delivery of input data and correctness for plant daily report to Utilities Lead
- Interface with technical services department for integrity issues and compliance checks
- Interface with HSSE department for compliance and improvements
- Interface with other departments for support requirements and documentation
HSSE
- 100% compliance with company HSE policies and guidelines.
- Champion HSE as a member of the LNG Operations Team.
- Lead HSE Shift Meeting/ safety walks /audits if required.
- Timely intervention to mitigate risks and ensure safety of personnel and plant.
- Demonstrate a personal commitment to influence overall safety behavior in the plant.
- Safeguarding systems check lists are implemented/completed by Shift Operations to agreed frequencies and standards.
- Ensure that Shift Operations Emergency Response capabilities are 100% met during shift period.
- Basic Fire Fighting and Emergency Response experience preferred.
Requirements
Required Experience:
- High School Diploma.
- Minimum 2-3 years in Industrial and/or Storage and Loading Facilities.
- 4th Class Power Engineering Certificate is minimum.
- Demonstrated previous experience in operations of industrial, storage and loading.
- Previous experience working with other departments to support production targets.
- Knowledge of actions required On Site First Intervention Team during Emergency Responses.
- Fully versed in Managing Safe Work with Permit to Work System.
- Are willing to comply with WLNG's drug-free and harassment-free work environment and comply with all safety policies and procedures.
- Undergo a pre-placement medical assessment of your fitness for duty, and Pre-Site Access testing for alcohol and specified drugs.
Additional Requirements:
- Communication/interpersonal skills – to be able to interact with front line workers through management.
- Ability to work well under pressure handling tasks, targets and changing priorities within tight time frames.
- Expertise with a variety of computer programs (e.g. MS Office).
- A valid driver’s license (with abstract) and passport.
- Must be legally entitled to work in Canada.
- The position is based in Squamish, BC (Project Site), with an initial stay period at the Vancouver Office
Only qualified candidates legally entitled to work in Canada will be contacted.
Thank you in advance for your interest!
Woodfibre Management Ltd. is an equal opportunity employer.
Woodfibre LNG reserves the right to amend the job description, including the title, duties, and qualification from time to time in its sole discretion.
Benefits
Hourly Rate: CAD $50.47 - $63.86/hr
Journal
Only you can see this. Kept on this device, and in your account when you sign in.