Posted yesterday
Cost Estimator, Data center construction
@ Bell Canada
Montréal, QC · Regina, SK · Toronto, ON
Overview
Bell Canada is hiring a Cost Estimator for its AI Fabric data centre program, reporting to the Director, Program Controls. The role develops early-stage, high-level capital cost estimates and Basis of Estimate documents for new data centre projects, sites and expansions. The posting states a hybrid arrangement requiring 3 days per week in a Bell office, plus flexible work hours, with a regular full-time, management-level position.
Responsibilities:
- Préparer des estimations de coûts en phase précoce pour de nouveaux projets
- Rédiger les Basis of Estimate et les hypothèses associées
- Maintenir les modèles de coûts, les repères et les taux unitaires
- Examiner les estimations externes d'entrepreneurs et de fournisseurs
- Transférer les estimations approuvées au contrôle des coûts
Requirements summary:
- Expérience en estimation de coûts d'immobilisations ou en contrôle de projet
- Capacité d'établir des estimations fiables à partir d'informations limitées
- Maîtrise avancée des modèles de calcul sur tableur
- Connaissance du français adéquate pour les postes au Québec
Tools & skills
Benefits mentioned
Source and dates
Employer career site / ATS feed · phenom
- Employer posting date
- 2026-11-10
- First seen by our source
- 2026-10-14
- Source record updated
- 2026-11-11
These dates describe the source record, not a live verification that the employer is still hiring. Check the original posting.
Job details
| Seniority | Mid level |
| Department | Finance & accounting |
| Hours per week | 40 (estimated) |
| Work setting | Office |
| Position | Mostly sitting |
| Physical demands | physical low · computer high |
| Languages | English, French |
| Perks mentioned | Employee discount, Wellness |
Summary and details written by AI from the posting; the employer’s posting is the authority.
Bell Canada
Saved company profile
Historical company information from a saved The Jobs API profile (LinkedIn/Crunchbase fields). It is not live-verified; figures may have changed. Missing values remain unknown.
Full company description
We advance how people connect with each other and the world #ConnectionIsEverything. Bell is Canada's largest communications company providing advanced Bell broadband wireless, Internet, TV, media and business communications services. Founded in Montréal in 1880, Bell is wholly owned by BCE Inc. To learn more, please visit Bell.ca or BCE.ca Through Bell for Better, we are investing to create a better today and a better tomorrow by supporting the social and economic prosperity of our communities. This includes the Bell Let's Talk initiative, which promotes Canadian mental health with national awareness and anti-stigma campaigns like Bell Let's Talk Day and significant Bell funding of community care and access, research and workplace initiatives throughout the country. To learn more, please visit Bell.ca/LetsTalk
- LinkedIn followers
- 373,247
- People associated on LinkedIn
- 34,021
- Reported office locations
- 1 carrefour Alexandre-Graham-Bell, Montreal, Quebec H3E 3B3, CA
- 5115 Creekbank Rd, Mississauga, ON L4W 5R1, CA
- 299 Queen St W, Toronto, ON M5V 2Z5, CA
- 22 Adelaide St E, Toronto, Ontario M5H 4E3, CA
- Other recorded names
- Bell
- Profile identifies a recruitment agency
- No
We advance how people connect with each other and the world #ConnectionIsEverything. Bell is Canada's largest communications company providing advanced Bell broadband wireless, Internet, TV, media and business communications services. Founded in Montréal in 1880, Bell is wholly owned by BCE Inc. To learn more, please visit Bell.ca or BCE.ca Through Bell for Better, we are investing to create a better today and a…
| Field | Value |
|---|---|
| Industry | Telecommunications |
| Company size | 10,001+ employees |
| Headquarters | Montreal, Quebec |
| Organization type | Public Company |
| Open jobs on Jobsy | 76 |
| View page |
Req Id: 433117
Connection is everything. It drives us to innovate, explore, and stay close to what matters to us most. At Bell, we’re building a more connected future through world-class networks, AI-powered solutions, and digital experiences that elevate how people live, work, and play every day.
We believe in empowering people. That’s why we equip our teams with cutting-edge technology, AI tools, and a collaborative environment that supports creativity and growth. Want to be part of a diverse team where your work makes a real impact? If you’re inspired by innovation that advances how people connect and transforms what’s possible, you belong on #TeamBell.
On the Bell Business Markets team, you’ll be a vital part of making innovation happen for enterprise-scale customers. You’ll deliver advanced solutions in areas such as IoT, Mobility/5G, Cloud, Cyber Security, Voice, Collaboration & Contact Centre and Internet & Private Networks.
At Bell, your skills and expertise will help set us apart as we continue to be the leading provider of digital connections and next generation services to businesses and governments.
Summary
Bell's AI Fabric program is focused on planning and delivering scalable, mission-critical data centre infrastructure. The Cost Estimator will provide early-stage cost planning and estimating support when potential projects, sites, expansions, or major scope packages are first identified. Working with limited and evolving information, the role will develop high-level capital cost estimates to support opportunity screening, business cases, funding decisions, portfolio planning, and executive decision-making.
Reporting to the Director, Program Controls, the role will establish estimate assumptions, document the Basis of Estimate, identify major cost drivers and exclusions, recommend appropriate contingency, progressively refine estimates as scope matures, and independently review external estimates.
Key Responsibilities
Early-Stage Project Estimating
• Develop conceptual, order-of-magnitude, Class D, and Class C estimates for newly identified projects, sites, expansions, and major infrastructure packages.
• Translate preliminary business, capacity, technical, site, and schedule requirements into an initial capital cost range.
• Prepare estimates using parametric models, historical benchmarks, unit rates, allowances, and comparable project data.
• Update estimates at project-development gates as scope, design, schedule, procurement strategy, and market information mature.
• Compare alternative sites, capacities, phasing plans, technical solutions, and delivery strategies.
Basis of Estimate & Scope Definition
• Prepare Basis of Estimate documents covering scope, methodology, assumptions, inclusions, exclusions, qualifications, escalation, contingency, and estimate accuracy.
• Coordinate with Engineering, Land Development, Procurement, Construction, Operations, Finance, and Project Delivery to validate inputs and scope boundaries.
• Develop cost breakdown structures aligned with the program WBS and cost-control framework.
• Identify scope gaps, interfaces, owner-furnished equipment, enabling works, temporary works, utility requirements, and operational-readiness costs.
Cost Planning, Benchmarking & Risk
• Maintain cost models, historical data, unit rates, benchmarks, escalation assumptions, and estimating templates.
• Normalize costs across sites, capacities, locations, delivery models, and estimate dates.
• Identify uncertainty, cost risks, opportunities, and major cost drivers.
• Recommend contingency appropriate to scope and design maturity.
• Perform sensitivity and scenario analysis for capacity, phasing, schedule, escalation, site conditions, equipment strategy, and utility scope.
Market Intelligence & Estimate Validation
• Coordinate budget quotations for major equipment, construction packages, professional services, and long-lead items.
• Monitor relevant labour, material, equipment, logistics, and construction-market trends.
• Review consultant, contractor, designer, and vendor estimates for completeness, consistency, and reasonableness.
• Reconcile estimate versions and explain changes in scope, quantities, rates, escalation, contingency, and exclusions.
Business Cases, Governance & Reporting
• Provide cost inputs for business cases, capital plans, funding requests, and executive decision materials.
• Prepare concise estimate summaries showing cost range, assumptions, exclusions, contingency, risks, and principal cost drivers.
• Present recommendations to the Director, Program Controls, project leaders, Finance, and executive stakeholders.
• Support the Director, Program Controls in launching and implementing estimating processes, standards, templates, tools, and governance routines.
• Maintain an estimate register showing status, maturity, version, approval basis, and next update.
Estimate Handover to Cost Control
• Provide the approved estimate, Basis of Estimate, cost breakdown, assumptions, exclusions, escalation, contingency, risk allowances, and reconciliation history.
• Map the estimate into approved cost codes, control accounts, and reporting structures with Cost Control.
• Support initial budget baselining and clarify estimate assumptions during execution planning.
• Use actual costs and variances from Cost Control to improve future benchmarks and estimates.
Critical Qualifications
- Experience in capital cost estimating, cost planning, quantity surveying, project controls, commercial management, construction management, or a related discipline.
- Ability to develop credible high-level estimates from limited and evolving information.
- Understanding of conceptual, Class D, Class C, and progressively detailed estimating methodologies.
- Experience preparing Basis of Estimate documentation and identifying assumptions, exclusions, allowances, escalation, contingency, and cost risk.
- Strong analytical and financial skills, including advanced spreadsheet modelling and cost analysis.
- Ability to review external estimates, challenge assumptions constructively, and communicate with executives.
Preferred Qualifications
- Experience supporting data centre, mission-critical, telecommunications, industrial, energy, or large infrastructure projects.
- Familiarity with data centre site development, design, procurement, construction, commissioning, operational readiness, and handover.
- Knowledge of electrical, mechanical, cooling, utility, building-shell, white-space, network, and security infrastructure.
- Experience with estimating software, cost databases, Power BI, Primavera P6, SAP, EcoSys, or similar tools.
- Professional designation or certification such as CCP, CEP, PQS, RICS, PMP, or equivalent.
Adequate knowledge of French is required for positions in Quebec.
Additional Information:
Position Type: Management
Job Status: Regular - Full Time
Job Location: Canada : Saskatchewan : Regina || Canada : Ontario : Toronto || Canada : Quebec : Montreal
Work Arrangement: Hybrid
Application Deadline: 11/25/2026
For work arrangements that are ‘Hybrid’, successful candidates must be based in Canada and report to a set Bell office for a minimum of 3 days a week. Recognizing the importance of work-life balance, Bell offers flexibility in work hours based on the business needs.
Please apply directly online to be considered for this role. Applications through email will not be accepted.
We know that caring for our team members is at the heart of a healthy, positive and thriving workplace. As part of our team, you’ll enjoy a comprehensive compensation package that includes a competitive salary and a wide range of benefits to support the well-being of you and your family. As soon as you join us, you'll be eligible for medical, dental, vision and mental health benefits that you can tailor to your specific needs. Plus, as a Bell team member, you'll enjoy a 35% discount on our services and access exclusive offers from our partners.
At Bell, we are proud of our focus on fostering an inclusive and accessible workplace where all team members feel valued, respected, supported, and that they belong.
Bell is committed to clarity in our hiring process. All roles posted are opportunities we’re actively recruiting for, unless stated otherwise. We also want to make sure that everyone has an equal opportunity to join our team. We encourage individuals who may require accommodations during the hiring process to let us know. For a confidential inquiry, email your recruiter or [email protected] to make arrangements. If you have questions or feedback regarding accessibility at Bell, we invite you to complete the Accessibility feedback form or visit our Accessibility page for other ways to contact us.
Artificial intelligence may be used to assess parts of your application. Please review our privacy policy (see Phenom for details) to learn more about how we collect, use, and disclose your personal information.
Created: Canada, SK, Regina
Bell, one of Canada's Top 100 Employers.
Journal
Only you can see this. Kept on this device, and in your account when you sign in.