6+ YOECandidates need a bachelor's degree in civil, mechanical or electrical engineering, at least 6 years of work experience including high-voltage transmission line design, and 4+ years of PLS-CADD experience. A P.Eng. or eligibility for APEGA registration is required.
Candidates need an electrical or civil engineering degree, EIT certification and substation experience. They also need to work with limited supervision and communicate well verbally and in writing.
EIT, Inspection, Regulatory compliance, Civil engineering, Communication skills, Customer service
5+ YOECandidates need at least 5 years of work experience and past project coordination or management experience, ideally in the utility industry. Strong communication, interpersonal and client-focus skills, plus the ability to manage multiple priorities, are essential. Experience in transmission or substation projects and P.Eng or P.L.Eng registration with APEGA are preferred.
Communication skills, Interpersonal skills, P.Eng.
3+ YOECandidates need 3 to 7+ years of drafting experience in MicroStation and AutoCAD, at least 3 years creating structural steel fabrication drawings, and a diploma in civil engineering technology or equivalent. Knowledge of steel detailing conventions and steel codes is required.
7+ YOECandidates need an ABET-accredited mechanical engineering degree, a PEng licence and 7 to 12 years of hydropower experience. Strong hydro turbine design, commissioning and FEA or CFD experience is required, along with a valid driver's licence and willingness to travel.
10+ YOECandidates need a proven record in high-voltage protection and control design, 10+ years of experience, and a B.Sc. in Electrical Engineering with APEGA registration. Strong communication, client focus, and utility industry experience are also required.
8+ YOECandidates need an engineering bachelor's degree or higher, 8 to 10+ years of steam turbine and generator engineering or services experience, and proficiency in engineering calculations and analyses. Professional Engineering licensure and an advanced degree are preferred.
6+ YOECandidates need a Bachelor's degree in Civil or Electrical Engineering, at least 6 years of experience, and a proven record designing high voltage transmission lines. APEGA registration or eligibility is required, and PLS Cadd experience is an asset.
5+ YOECandidates need a bachelor's degree in electrical engineering or a related field, about 5 years of utility or distribution planning experience, and hands-on use of distribution modelling tools. An EIT/FE designation (or ability to obtain it) and willingness to travel up to 5% are also required.
1+ YOECandidates need one year of distribution project design experience and an electrical or civil engineering technology diploma, a power lineman certificate with design experience, or an engineering degree. Strong Microsoft Office 365 and software skills, attention to detail, and clear communication are required.
1+ YOECandidates need at least one year of distribution project design experience, plus an electrical or civil engineering technology diploma, a power lineman certificate with design experience, or an engineering degree. Strong computer, communication and organizational skills are required, and design software experience such as PLS-CADD, AutoCAD or MicroStation is an asset.
5+ YOECandidates need at least 5 years of civil design experience on high voltage substations in the utilities industry, a B.Sc. in Civil Engineering and an active P.Eng with APEGA. Strong communication, client focus and skills across earthworks, foundations, geotechnical and structural work are preferred.